Sector
Marine
Location
Aberdeen, Scotland
Services
Vibration Analysis
Remote Monitoring and Data Services

Our partnership with GulfMark UK
Overview
Our engineers detected a bearing fault on an input shaft to the thruster.
The bearing was deteriorating over time, and it was recommended that it should be replaced during a scheduled port call. The cost of replacing in-situ bearing compared to overhauling the thruster unit equated to savings of £295,000.
GulfMark tasked us with rolling out a Condition Based Maintenance (CBM) programme throughout their fleet with the goal of improving their maintenance strategy and reducing maintenance costs.
The challenge
The solution
The result
Our engineers detected deterioration in the first support bearing on the input shaft to the thruster.
The thruster was monitored over a period of time to determine the rate of deterioration.
The rate of change detected indicated that the bearing needed to be replaced.
The bearing replacement and general inspection was completed during a port call with minimal interruption to the vessel’s operations.
Upon inspection the poor condition of the input bearing was confirmed – see figure 1.
Figure 1: First support bearing from the input shaft on the thruster.
Key outcomes
Detected deterioration in the first support bearing on the input shaft to the thruster.
Scheduled replacement during a port call, minimising disruption to vessel operations.
Confirmed the poor condition of the input bearing during inspection.
Confirmed the poor condition of the input bearing during inspection.
Saved £295,000 compared to overhauling the thruster unit.

Contact us to find out more about our Condition Monitoring solutions
Related Case Studies
View All Case Studies
Vessel Downtime Avoided for UK Ferries Operator
Read more.
Testing Subsea Air Bags with SmartLoad® Load Monitoring Technology
Read more.